Description:
|
Krystalkrete®
pool finishes are blends of enriched White Portland Cement and special
Quartz aggregates. Krystalkrete® offers the pool builder an alternative
to conventional pool finishes by using combinations of different Quartz
sizes and colors as well as a variety of pigments. Krystalkrete® is
available in many attractive colors, which allows the pool builder
and homeowner limitless flexibility in tile and accessory selection.
Although application and finishing techniques are not difficult to
learn, Krystalkrete® is intended for use by the professional
applicator. |
|
Packaging
|
80-lb.
Heavy-duty 3-ply paper bag with plyethylene moisture barrier liner |
|
Coverage:
|
20
- 25 square feet per 80-lb. bag. The surface condition will have a
direct relationship on the thickness of application and the corresponding
coverage rate per bag. |
|
Preparation:
|
Krystalkrete®
should be applied to a sound surface free of oil, dirt, algae or any
other foreign substance. Previously applied paints or sealers must
be removed by acid washing and/or sandblasting. Neutralize acid with
baking soda or soda ash then thoroughly rinse with water. In addition
to, or in partial replacement of, the procedures mentioned above,
CLI PermaKote can be used as a bonding coat. Re-finished pools
must be undercut an appropriate distance around all tile, return lines,
light fixtures and main drains. All weepers and plumbing leaks should
be repaired at least 24 hours prior to plaster application. |
|
Mixing:
|
1.
Using standard mixing equipment, it is important to blend each batch
for the same amount of time.
2. Mix Krystalkrete® with approximately 2 to 2 1/2 gallons of potable
water per 80-lb. bag.
3. Start the mixing procedure by adding approximately 2/3 of the total
water and Krystalkrete® requirements to the mixer, then add the balance
of water.
4. Mix the completed batch for at least 8 minutes to ensure a proper
blend of all ingredients. |
|
Water
Chemistry:
|
The
pool water must be carefully balanced from the initial fill and constantly
maintained within recommended NSPI guidelines. Maintaining proper
chemical balance from first fill is essential to maximize the life
of the pool surface. Please consult your CLI Product Service Representative
concerning start-up techniques and maintenance programs. |